Our reputation within this field has grown rapidly in recent years, an area in which we are extremely confident and capable. There are a growing number of MUGA pitches we have installed in a wide variety of locations. Our team are highly experienced and able to work to the highest standard within tight time constraints producing great multi use areas for sports and games that will stand the test of time and use.
Cedar House School Cryyff Court – Bentham, Lancaster
Timescale: 4 weeks
Oversands School – Grange-Over-Sands
Timescale: 5 weeks
Multi Use Games Area – Southport
Timescale: 3 months
This project involved development of a 2500m2 multi-use games area for a Southport based private school. The works included specialist ground works in order to meet specific regulations, the installation of structural retaining gabion walling to perimeter, installation of specialist polymeric surfacing.
Multi Use Games Area – Ormskirk, Bolton and Sunderland
Timescale: 6-12 weeks
These three projects were carried out throughout 2020, the work involved with these projects included excavation and drainage, formation of sub-base, tarmac base, bespoke fencing, artificial sport surface installation and associated external works.
Cumberland School Cryyff Court – Bolton
Timescale: 6 weeks
Scarisbrick Hall School – Southport
Timescale: 10 weeks
Queensmead House School Cryyff Court – Windsor
Timescale: 5 weeks
Pontville School Cryyff. Court – Ormskirk
Timescale: 8 weeks
Ashbrooke School Cryyff Court – Sunderland
Timescale: 5 weeks
Millcourt School Cryyff. Court – Halifax
Timescale: 5 weeks
Blackpool and Fylde College, Fleetwood Campus MUGA
Value approx: £130k
Timescale: 10 weeks
Works involved the scraping off of existing surface, reduced level dig, new drainage and the construction of new surfacing and fencing to create new Multi Use Games Area at Fleetwood Nautical Campus
Lakeside School, Huyton MUGA
Value approx: £90k
Timescale: 7 weeks