Value approx: £80k
Timescale: 7 weeks
Work consisted on strip out and demolition of existing rooms which created separate toilets, including removal of existing services, demolition of existing partitions to create large open space. Then configuration of new unisex toilet space to using high specification cubicles and IPS systems. All new services including plumbing, drainage, ventilation and electrics. This was a design and build project and we worked with client to produce a design which suited there requirements.
Value approx: £30k
Timescale: 4 weeks
The creation of new teaching space in alcove on the second floor of the main building, works included new partitions, glazed fire rated screens to match existing, M and E works including ventilation alterations, decroation, ceiling grid and floor finishes and minor fitting out.
Value approx: £70k
Timescale: 5 weeks
Project consisted of forming new therapy suite with additional offices at school in bamber bridge. Work was carried out over the school summer holidays and delivered one week early. Also included in the project was the refurbishment of 4 existing classrooms and toilet blocks.
Value approx: £45k
Timescale: 6 weeks
Works involved extensive alterations and remodelling of classrooms and staffroom, fitting of a new kitchen, extension to the mezzanine roof and other structural alterations and improvements. Works were completed within the tight deadline of the school summer holidays.
Value approx: £2m +
This project involved the carrying out of extensive restoration and renovations works to a substantial part of this grade 1 listed building. Works included transforming an unused wing into a new science block, the fit out of a new modern library, structural alterations and re-roofing. In addition, the works also included the conversion of a second unused block of an up to date sixth form lounge, common room, classrooms and associated amenities.
Value approx: £160k
Timescale: 6 weeks
Work was carried out in the 2020 summer holiday work consisted of; Structural Alterations and refubishment to Form Kitchen and Dining Hall, Creation of new shower block, Modifications to form Science classroom and Laboratory, Groundworks maintenance across site, Refurbishment of Music Suite.
Value approx: £70k
Timescale: 6 weeks
Strip out of existing toilets and replaced with new unisex full height WC and IPS panels, sanitary ware and suspended ceiling including all mechanical and electrical works, flooring and decoration alterations.
Value approx: £200k
Timescale: 12 weeks
A new build extension was constructed during the school shutdown period. The project involved various stages such as groundworks, which included preparing the site for construction, laying foundations, and landscaping. Additionally, a steel frame was erected to provide structural support to the extension. The full fit-out process included installing internal fixtures, fittings, and finishing touches to complete the extension in readiness for use. The construction was carefully planned and executed to ensure minimal disruption to the school environment during the shutdown period.